Kendo UI Feedback

Kendo UI by Progess is a modern HTML5, jQuery-based framework that provides everything you need to build web and mobile sites/apps with HTML and JavaScript. It includes optional server-side wrappers for ASP.NET MVC, JSP and PHP frameworks.

Download a free Kendo UI Trial
Try Kendo UI Online Demos

Help make Kendo UI better by sharing and voting on ideas here! Deal? Cool. Thanks.

I suggest you ...

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback
  1. Provide real AngularJS integration for Gantt (e.g. Task Template, Toolbar Template)

    Currently Task Template and Toolbar Template doesn't integrate with AngularJS. E.g. it is impossible to use {{ $ctrl.mymember }} or <my-angular-component></my-angular-component> for the task template in gantt.

    3 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      I agree to the terms of service
      Signed in as (Sign out)
      You have left! (?) (thinking…)
      1 comment  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
    • Gantt: Hour Span

      Hour Span should be allowed integer values instead of only number values(currently it takes the floor of any decimal value)

      6 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        I agree to the terms of service
        Signed in as (Sign out)
        You have left! (?) (thinking…)
        0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
      • Gantt: Add time-based weighting into percent complete calcs

        Currently % complete calcs for summary tasks are based solely on the sum of % complete per child task / number of child tasks (x%+y%+z%)/3. In this way, a small scale task of 1 or 2 days has a large impact on summary % complete whereas a large task of 60 days has a small impact. Request is to add in weighting based on duration (end date - start date).

        2 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          I agree to the terms of service
          Signed in as (Sign out)
          You have left! (?) (thinking…)
          0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
        • Gantt resource template should be configurable

          Currently gantt resource name template is a hardcoded as "{name} [{percents}]" and to change it we need to patch kendo scripts (in our case to remove percents part)

          19 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            I agree to the terms of service
            Signed in as (Sign out)
            You have left! (?) (thinking…)
            0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
          • controls that support project data needs filtering and paging.

            You can have thousands of lines (rows) of project data....you can't load the entire plan and scroll through it

            1 vote
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              I agree to the terms of service
              Signed in as (Sign out)
              You have left! (?) (thinking…)
              0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
            • Gantt zoom

              Add a zoom slider so that the tasks rows /time columns will be smaller. Showing more or less tasks and time

              4 votes
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                I agree to the terms of service
                Signed in as (Sign out)
                You have left! (?) (thinking…)
                0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
              • Template for Parent Task

                Can create a template for parent task. Like we can create for child tasks.

                9 votes
                Vote
                Sign in
                Check!
                (thinking…)
                Reset
                or sign in with
                • facebook
                • google
                  Password icon
                  I agree to the terms of service
                  Signed in as (Sign out)
                  You have left! (?) (thinking…)
                  0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                • Set a custom holidays in MVC UI gantt view.

                  Is it possible to set custom holidays in gantt like Windows version ?

                  9 votes
                  Vote
                  Sign in
                  Check!
                  (thinking…)
                  Reset
                  or sign in with
                  • facebook
                  • google
                    Password icon
                    I agree to the terms of service
                    Signed in as (Sign out)
                    You have left! (?) (thinking…)
                    0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                  • Add ng-click to Gantt Column like in Grid

                    I am working with AngularJs and in the normal Grid its possible to add ng-click Events to Columns with the Attribute Property for the ColumnDefintion, that would be great if this works too for the Gantt Chart. Because I can add a ng-click to Gantt Column and with the event I can get the current row Id and open my own custom Modal to edit the Values.

                    21 votes
                    Vote
                    Sign in
                    Check!
                    (thinking…)
                    Reset
                    or sign in with
                    • facebook
                    • google
                      Password icon
                      I agree to the terms of service
                      Signed in as (Sign out)
                      You have left! (?) (thinking…)
                      0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                    • Add Gantt Tooltip control capabilities

                      Currently there is only template for Gantt
                      I need to be able to control the tooltip behaviour.

                      showOn:"mouseenter", "click" , "focus"
                      autoHide: true, false
                      position: "bottom", "top", "left", "right", "center"

                      2 votes
                      Vote
                      Sign in
                      Check!
                      (thinking…)
                      Reset
                      or sign in with
                      • facebook
                      • google
                        Password icon
                        I agree to the terms of service
                        Signed in as (Sign out)
                        You have left! (?) (thinking…)
                        0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                      • Support for Actual and Planned Comparison in Gantt Chart

                        Most of the time project managers would like to compare planned start & end dates vs actual start and end dates in gantt view. This feature is not supported by current Gantt chart. What I'm envisioning is something similar to the implementation of Gantt chart by Fusion Charts. (http://www.fusioncharts.com/charts/gantt-charts/). Displaying delays in actual task compared to plan would be an an added advantage. This feature may be implemented using a task template, but it's nice to have feature in the control.

                        19 votes
                        Vote
                        Sign in
                        Check!
                        (thinking…)
                        Reset
                        or sign in with
                        • facebook
                        • google
                          Password icon
                          I agree to the terms of service
                          Signed in as (Sign out)
                          You have left! (?) (thinking…)
                          0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                        • Enable marking of certain timespans in Gantt timeline (for example holidays)

                          Right now the Gantt marks the current day with a line.

                          It would be great if we could pass an array of objects with title, type and begin/end information, which would be marked on the timeline background in a similar way -- for example display holidays or context time information (when planning something in a larger context).

                          Does not need to be editable -- being able to override the color for each object would be nice

                          3 votes
                          Vote
                          Sign in
                          Check!
                          (thinking…)
                          Reset
                          or sign in with
                          • facebook
                          • google
                            Password icon
                            I agree to the terms of service
                            Signed in as (Sign out)
                            You have left! (?) (thinking…)
                            0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                          • 3 votes
                            Vote
                            Sign in
                            Check!
                            (thinking…)
                            Reset
                            or sign in with
                            • facebook
                            • google
                              Password icon
                              I agree to the terms of service
                              Signed in as (Sign out)
                              You have left! (?) (thinking…)
                              0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                            • Mutli-select tasks in gantt chart and use keyboard delete key to delete tasks

                              I would like to multi-select some tasks in a level and use keyboard delete button and delete all of them.

                              6 votes
                              Vote
                              Sign in
                              Check!
                              (thinking…)
                              Reset
                              or sign in with
                              • facebook
                              • google
                                Password icon
                                I agree to the terms of service
                                Signed in as (Sign out)
                                You have left! (?) (thinking…)
                                1 comment  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                              • Gantt Scaling Adjustment For PDF Export

                                Problem: We really want to fit Gantt's on particular paper sizes (def. landscape A3); however, using the paperSize option doesn't really work as the output (font size, row heights, etc.) end up being too big and not suitable.

                                And for the majority of the time, paperSize set to auto creates an output (font size mostly) too small.

                                Rock and a hard place...

                                Solution 1: When pdf.paperSize is not set to auto i.e. A3, A4, etc. Allow a percentage scaling to be set, ideally individually, on X and Y.

                                Solution 2: Scale fonts and scale timeline on X axis maintaining taskList…

                                10 votes
                                Vote
                                Sign in
                                Check!
                                (thinking…)
                                Reset
                                or sign in with
                                • facebook
                                • google
                                  Password icon
                                  I agree to the terms of service
                                  Signed in as (Sign out)
                                  You have left! (?) (thinking…)
                                  0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                                • Multiple Page PDF Export For Gantt

                                  Incorporate page breaks into the Gantt PDF Export and include option to repeat column headers on each page.

                                  16 votes
                                  Vote
                                  Sign in
                                  Check!
                                  (thinking…)
                                  Reset
                                  or sign in with
                                  • facebook
                                  • google
                                    Password icon
                                    I agree to the terms of service
                                    Signed in as (Sign out)
                                    You have left! (?) (thinking…)
                                    1 comment  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                                  • critical path

                                    Add a way to highlight the critical path in the Gantt Chart. This is a basic feature in project management and would be really great if you can implement,.

                                    34 votes
                                    Vote
                                    Sign in
                                    Check!
                                    (thinking…)
                                    Reset
                                    or sign in with
                                    • facebook
                                    • google
                                      Password icon
                                      I agree to the terms of service
                                      Signed in as (Sign out)
                                      You have left! (?) (thinking…)
                                      2 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                                    • Center Gantt timeline to a given date

                                      Add possibility to automatically center the Gantt timeline to a given date onload.

                                      8 votes
                                      Vote
                                      Sign in
                                      Check!
                                      (thinking…)
                                      Reset
                                      or sign in with
                                      • facebook
                                      • google
                                        Password icon
                                        I agree to the terms of service
                                        Signed in as (Sign out)
                                        You have left! (?) (thinking…)
                                        1 comment  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                                      • Gantt: Allow parent row expand from any column

                                        The Gantt widget has support for parent-child relationship, but the hierarchy only works, if the title property of a gantt task is used in column definitions. So if you have for example only an ID column in your column definition, you can not expand/shrink hierarchy.

                                        Suggested improvement: make this option configurable via the columns declaration by adding "expandable: true/false" or make the hierarchy appear in the first column if the title property is not in the columns declaration.

                                        3 votes
                                        Vote
                                        Sign in
                                        Check!
                                        (thinking…)
                                        Reset
                                        or sign in with
                                        • facebook
                                        • google
                                          Password icon
                                          I agree to the terms of service
                                          Signed in as (Sign out)
                                          You have left! (?) (thinking…)
                                          0 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
                                        • In the Gantt control, remove built-in validation on Finish date

                                          From the 2015.2 release to the 2015.3 release, the built-in validation on the Start date was removed from the left-hand treelist. So now I can move the Start date to be after the Finish date, and the Gantt control responds by treating this as a "move". However, there is still built-in validation on the Finish date so that I cannot move the Finish date to before the start. I would expect the same behavior for changes in both directions. If I change the Finish date to before the Start date, then this should also be treated as a "move", where…

                                          5 votes
                                          Vote
                                          Sign in
                                          Check!
                                          (thinking…)
                                          Reset
                                          or sign in with
                                          • facebook
                                          • google
                                            Password icon
                                            I agree to the terms of service
                                            Signed in as (Sign out)
                                            You have left! (?) (thinking…)
                                            1 comment  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →

                                            Thanks for the report, Brian.

                                            To escalate the resolution of this case, can you report it via our standard support channels (forums or support system) at telerik.com? Thus our colleagues will review and address it accordingly. Thank you for your cooperation.

                                          ← Previous 1
                                          • Don't see your idea?

                                          Kendo UI Feedback

                                          Feedback and Knowledge Base